Across the Kingdom, more and more factories, hotels, hospitals and central kitchens now run their own reverse osmosis plant rather than relying on small point-of-use units. If you manage a site in Riyadh, Jeddah, Dammam or Makkah and are weighing up a plant, this guide walks through the decisions that matter at building scale: how much water you really need, what your feed water does to the design, where the brine goes, and what the plant will cost you each year once the new National Water Company tariffs start on 1 January 2027. Plant prices themselves are quoted per site, because the design follows your water analysis and your demand.
TL;DR
- Start from metered daily demand and the hours the plant can run. A storage tank then absorbs the peaks.
- About half the water distributed in the Kingdom in 2023 was desalinated seawater. Much of the rest is groundwater, which changes the pre-treatment a lot.
- A plant always rejects some of its feed. At 50% recovery, every litre of RO water means another litre to drain.
- From 1 January 2027, NWC's top tier is SAR 6 per m3 for water and SAR 3 per m3 for wastewater.
- A 4,000 litre-a-day plant at 50% recovery would send roughly SAR 13,100 a year of water to drain at that top tier, before VAT.
Have a factory, hotel or kitchen project in mind? Request a Quote with your city, your water source and your daily use.
In this article
- Who uses an RO plant in Saudi Arabia
- Working out the right capacity
- Desalinated supply or groundwater: why it matters
- Where the reject water goes
- Checklist for the plant room
- Running costs at the 2027 tariffs
- Keeping the plant healthy
- Frequently asked questions
- Sources
Who uses an RO plant in Saudi Arabia
A plant is a complete treatment line, not a single filter. It has its own pre-filters, a high-pressure pump, a bank of membranes, controls and, in most buildings, a treated-water tank and a booster pump. If you want a refresher on how the membrane itself works, read our explainer on reverse osmosis in Saudi Arabia first.
Typical Saudi users include:
- food and beverage factories in the industrial cities, for product and rinse water;
- hotels and serviced apartments in Makkah, Madinah and Riyadh, for ice, coffee and kitchen water;
- hospital kitchens and laboratories, often with further polishing after the RO;
- bakeries and central production kitchens feeding several branches;
- plants that need low-mineral boiler or process feed.
Restaurants with one kitchen usually need something smaller. Our guide on why restaurants in Saudi Arabia need reverse osmosis covers that end of the range.
Working out the right capacity
The common mistake is to size from the building drawings. Size from how the water is used instead:
- Measure what each machine and outlet draws on your busiest day. A sub-meter for two weeks is worth more than any estimate.
- Note the heaviest hour, such as a production shift start or the breakfast rush.
- Agree how many hours a day the plant may run to refill the tank.
- Pick a tank big enough that the plant never has to chase the busiest minute.
- Leave headroom for growth, and for the output loss you see as membranes age.
Here is a worked case using datasheet numbers. A bakery needs 4,000 litres of RO water a day. The Majestic 400 RO is rated at up to 400 litres an hour at 25 °C, so it would run about 10 hours to meet the day. At its 50% recovery rate it takes in roughly 8,000 litres and rejects roughly 4,000 litres. Feed water in summer can be far warmer than 25 °C, and pressure varies by district, so the real output at your site must be confirmed.
When the daily figure climbs into tens of cubic metres, an engineered skid is the better fit. Our industrial reverse osmosis plants are built in stainless steel on a skid, up to 56 m3 an hour, and remove up to 99% of dissolved solids. Each one is designed from a feed water analysis.
Not sure whether you need a compact unit or a full skid? Talk to Our Team and share your meter data.
Desalinated supply or groundwater: why it matters
The Kingdom's water comes from two very different places. Official figures show desalinated seawater made up about half of the water distributed in 2023, up from 44% the year before. Much of the remaining supply is drawn from groundwater, and that is where most of the design work sits.
- Desalinated network water. Usually low in dissolved solids when it leaves the plant. The risks come later: roof and ground tanks, sediment, and residual chlorine that can attack membranes. Sediment and carbon filters are the normal starting point.
- Groundwater, from a municipal blend or your own well. It can be much harder and higher in dissolved solids, and may carry iron or other minerals. A full laboratory analysis comes before any design, and softening ahead of the membranes is common.
- Delivered water. Quality depends on the source and the tank it lands in, so allow for extra sediment filtration.
Not sure what your readings mean? Our article on ppm and TDS for commercial water testing explains the numbers. For hard feed water on a production line, see controlling water hardness on a production line.
Once the water is treated, it often sits in a tank. A UV unit on the outlet side keeps it protected on the way to the taps and machines.
Where the reject water goes
The membrane does not destroy the salts it removes. It concentrates them into a stream that leaves the plant, called reject or brine. The recovery rate is the share of feed that becomes product water. The rest is reject.
Points to settle at design stage:
- The drain line must carry the full reject flow while the plant is running, not an average over the day.
- Discharge through an air gap so nothing can siphon back into the plant.
- Any reuse, such as for landscaping or cooling make-up, needs checking first and its own clearly marked pipework, kept apart from drinking water.
- The incoming supply has to deliver the feed flow, which is higher than the product flow. On a groundwater site, that also means more pumping.
Checklist for the plant room
Before installation day, walk the room with this list:
- a floor drain or gully near the plant, big enough for the reject flow;
- a power supply to suit the unit (the Majestic 400 RO lists 220 V and 500 W; skids need more);
- cooling or ventilation, since summer plant rooms in Riyadh and Dammam run very hot, and the Majestic 400 RO is rated for feed water from 5 to 45 °C;
- inlet pressure inside the unit's range, 1 to 6 bar on the Majestic 400 RO, with a booster if the network falls short;
- space to slide out membrane housings and swap cartridges;
- room for the product tank and the distribution pump;
- sample taps on the feed and the product side.
Running costs at the 2027 tariffs
The National Water Company announced revised tariffs that take effect on 1 January 2027. They apply to residential, non-residential and government customers, in four monthly tiers:
| Monthly use | Water, per m3 | Wastewater, per m3 |
|---|---|---|
| Up to 15 m3 | SAR 1 | SAR 0.50 |
| 15 to 30 m3 | SAR 2 | SAR 1 |
| 30 to 45 m3 | SAR 4 | SAR 2 |
| Over 45 m3 | SAR 6 | SAR 3 |
The Saudi Energy Company also set commercial electricity at 25 halalas per kWh up to 6,000 kWh a month and 35 halalas above that. Monthly meter charges and 15% VAT come on top. A factory or hotel will pass the top thresholds every month, so its extra water and power fall in the top tiers.
Back to the 4,000 litre-a-day bakery at 50% recovery:
- Reject: about 4,000 litres a day, or roughly 1,460 m3 a year. At SAR 9 per m3 for water plus wastewater, that is about SAR 13,100 a year before VAT.
- Electricity: 500 W for about 10 hours a day comes to roughly 1,825 kWh a year. At 35 halalas, about SAR 640 a year.
- Better recovery: the same output at 75% recovery would reject about 1,330 litres a day. The reject bill would fall to around SAR 4,400 a year.
The product water replaces water the site would have bought anyway, so the reject stream is the real extra cost. Treat these as estimates from published rates: check your own bill, as how wastewater is charged can depend on your connection. Cartridges, membranes and servicing are extra and depend on your feed water; we set those out in the proposal.
When you compare suppliers, ask each one for the output at your summer feed temperature, the recovery rate, the pre-treatment and the reason for it, the consumables list and the service plan. Compare the total over five years, not the purchase price alone. For a wider view of the options, see our business water treatment guide for Saudi Arabia.
Keeping the plant healthy
High feed temperatures speed up fouling and biological growth, so a plant here needs a firm routine:
- swap sediment and carbon cartridges on a calendar, not when the flow drops;
- record feed and product conductivity, pressures and flows each week;
- clean the membranes when the trend says so, and replace them once a clean no longer brings them back;
- clean and inspect the product tank and any roof tanks;
- flush or sanitise the plant if it sits idle, for example during a summer shutdown.
For more detail, read our guide to RO membrane maintenance and cleaning in Saudi Arabia and the water treatment maintenance schedule for commercial buildings. Our maintenance plans take care of the booking.
Want a plant sized around your water? Request a Quote and send your water report if you have one.
Frequently asked questions
How much does it cost to run an RO plant in Saudi Arabia?
At the NWC tariffs from 1 January 2027, a plant making 4,000 litres a day at 50% recovery would send about SAR 13,100 a year of water to drain at the top tier, before VAT. Power for a compact unit is a few hundred riyals a year. Cartridges, membranes and servicing are extra.
Is an RO plant worth it on desalinated network water?
Sometimes. Network water is often low in dissolved solids, so filtration and UV may be enough. RO pays off where machines or a process need very low dissolved solids, or where the site draws groundwater.
Can an RO plant treat well water?
Yes, with the right pre-treatment. Groundwater is often harder and higher in dissolved solids, so a laboratory analysis comes first and softening is often needed ahead of the membranes.
How can I reduce the reject water?
Choose a design with a higher recovery rate, and make sure pre-treatment protects the membranes so they run at their designed recovery. Some sites reuse reject water for non-drinking uses after checks.
Talk to Our Team about an RO plant
Tell us your city, your feed source, your daily and peak demand and what the water is for. We will size the plant, set out pre-treatment, drainage and the plant room, and quote in riyals. Get in Touch.
Sources
- Saudi Gazette: Saudi Arabia announces revised electricity, water and wastewater tariffs effective January 1, 2027
- ARY News: Saudi Arabia announces new electricity, water and wastewater charges
- Arab News: Saudi Arabia boosts desalinated water supply to 50% (GASTAT water accounts)
- World Health Organization: Guidelines for Drinking-water Quality, chapter 6 (PDF)
- Sovereign Water product specifications: Majestic 400 RO, Industrial Reverse Osmosis